About ECRL

Malaysia's East Coast Rail Link - A transformative infrastructure project connecting the nation

Project Overview

The East Coast Rail Link (ECRL) is a 665-kilometer railway network designed to connect Malaysia's east and west coasts, enhancing regional connectivity across Kelantan, Terengganu, Pahang, and Selangor. This transformative national infrastructure project is engineered to facilitate both passenger and freight transport while catalyzing economic growth along its alignment.

Route Alignment: East to West

The ECRL begins in Kota Bharu, Kelantan, which is planned as a major transportation hub in the northeast. From there, the alignment proceeds southwest through Pasir Puteh, offering improved access to southern Kelantan.

The route then enters Terengganu, passing through key towns along the state's coastline including Jerteh, Bandar Permaisuri, Kuala Terengganu (the state capital), Dungun, Kemasik, and Chukai. These locations are expected to benefit from better passenger mobility and more efficient freight transportation, especially for Terengganu's growing tourism and oil & gas sectors.

Continuing south, the rail enters Pahang, moving through Cherating, Kuantan Port City, Kota SAS, Paya Besar, Maran, Temerloh, and Bentong. In Pahang, the line supports connectivity to industrial areas and agricultural regions. The ECRL traverses the Titiwangsa mountain range through engineered tunnels and viaducts before reaching Bentong, and eventually arriving at the Gombak Integrated Terminal in Selangor.

West Coast Extension

Phase 2 of the project continues the line from Gombak to Port Klang, passing through Serendah, Puncak Alam, and Kapar, linking to one of Malaysia's busiest ports. This segment is vital for freight transport, allowing goods from the East Coast to be directly shipped or distributed through the Port Klang logistics hub.

ECRL Railway Construction Gombak Integrated Terminal

Key Features

⚡

High Speed

Passenger trains: 160 km/h
Freight trains: 80 km/h

📅

Timeline

Phase 1: January 2027
Phase 2: January 2028

📦

Dual Purpose

Both passenger and freight services for comprehensive connectivity

👥

Economic Impact

Catalyzing growth in tourism, industry, and commerce

Project Details

Total Length

665 kilometers spanning four states

Number of Stations

20 stations (10 passenger + freight stations)

States Covered

Kelantan, Terengganu, Pahang, and Selangor

Travel Time

Gombak to Kota Bharu in just 4 hours (express service)

Project Completion

89% complete as of October 2025

Benefits of ECRL

Enhanced Connectivity

Bridges gaps between underserved East Coast areas and major economic hubs in the West, improving mobility for millions of Malaysians.

Economic Growth

Catalyzes development in tourism, oil & gas, industrial, and agricultural sectors along the ECRL corridor.

Faster Travel

Dramatically reduces journey times - Gombak to Kota Bharu in just 4 hours compared to 6-7 hours by road.

Freight Efficiency

Direct connection to Port Klang enables efficient distribution of goods from East Coast to international markets.

Sustainable Transport

Electric trains offer an environmentally friendly alternative to road transport, reducing carbon emissions.

Regional Integration

Connects with existing rail networks and public transit systems for seamless multimodal journeys.

---